e.planning: timeline playback and rough cost estimation in the dashboard

Product Updatesapprox. 5 min read

Viewing measures along the time axis, estimating budgets early: what the latest release changes for investment planning.

Measures over time instead of as a list

The new timeline playback makes it possible to run expansion measures through the planning years. Instead of a static list, a sequence of grid states emerges: which measure takes effect when, which bottlenecks disappear as a result and which new ones appear elsewhere. This reveals dependencies between measures that get lost in a table.

In addition, the rough cost estimation provides an initial budget figure directly in the dashboard. It works with stored cost rates per measure type and quantity structure and does not replace a detailed calculation – it answers the earlier question: is this expansion path even within a plausible order of magnitude?

Together, the two shift the discussion forward. Variants can be compared by effect and budget frame while still at the planning stage, rather than only after detailed design.

Want to try the release on your own grid?We will demonstrate timeline playback and rough cost estimation using an example from your grid area.Arrange an initial consultation
Share this article

Your use case, our initial consultation

Whether you have first questions or a concrete project: we look at your data sources, the relevant profiles and the biggest hurdles in your current process – informally and on a technical level.

Name
AuthorName, Role
enervance solutions GmbH

We reply personally – no newsletter, no automated funnel.